离心球墨铸铁管之安装

日期:2018-4-3 10:25:26

离心球墨铸铁管之安装 Mounting of Centrifugal Ductile Cast Iron Pipes

    青岛钢益管业有限公司之产品,采用方便的T型滑入式柔性接口,具有出色的抗震性能、密封性能喝防腐性能。在遇到地形发生变化时,埋在地下的铸铁管沿轴线允许偏转3-5度角。球墨铸铁管适合在各种地形和气候条件下施工安装。简捷的安装方法必能加快工程进度,降低施工成本,较之钢管施工,可降低其费用1/3。 
  Our products use convenient and soft T-type socket joint and possess excellent properties of antknocking,sealness and anticorrosion.Being situated in topography change mounting axial line could be changed within 3-5.both ductile cast iron pipe and fitting are suitable for mounting under the different topography and climate situation .Simple monting method enables to quicken the pace of project and reduce the construction cost.Comparing with steel pipe,the cost of installation could be reduced by one-third


产品运输、储存、装卸注意事项 The cautions of products about diliver,strage,loading and unloading
 
      A、球铁馆在装车时,伸出车体外部分不得超过球铁管长度四分之一。
  B、在装卸的过程中要轻吊轻放,严禁在车上向地面抛卸。
  C、球铁管在搬运和堆放过程中,严禁硬物及球铁管相互间的碰撞。
  D、管架上每层球铁管应将承插口相间平放并用木块垫好,上下层管方向垂直。
  E、存放球铁管的地面应平坦松软,硬地面应垫木块。

  A.When loading,the length for out of the truck must be less one fourth of the total length .
  B.Must gently when loading and unloading ,must not no throw on the floor.
  C.wWhen Carring and stacking,must not conllide each other and with other hard objects .
  D.Please carefully stack with block underlaying on shelf.closed layer put vertically each other .
  E.The floor fourth storage should be soft and plane,should underlay with block on hard floor 

连接部位的清理    The Clena of Joint Part

 

    需要清理的部位:
    The part should be cleaned :

    承口内部:
    特别是环形密封槽和定位槽清理净。
    In side of socket especially for the part of touching with rubber ring .

 

 

     橡胶密封圈:
    特别是定位圈部位清理净。
    Rubber sealing ring

 

     插口端:
    从倒角到标记线间距离清理净
    Spigot :
    Clean the end of spigot to mark line.

 

   按图方法握住橡胶密封圈。
   Hold ring as left picture 
 

 

   把橡胶密封圈放入承口内,将带有硬质固定缘的橡胶密封圈稳固地放入固定槽内并将橡胶圈压平,
   PUt ring into socket.
 

 

   另一种简易方法是将橡胶密封圈弯曲二点,即成 形,放入固定槽和密封槽内,再依次按平两点凸起部位即可。
   注意:固定缘的内边,不能从固定槽中凸起。
   Pick two points (of more for big size pipe)up,and then push them.
 

  
 

   再将密封槽滑脂涂抹在橡胶圈的表面
   PUt lubricant paste on the surface of runbber ring fixed 
 

  
  
  
 

www.gyguanye.com



 

上一篇: 球墨铸铁管
联系我们

华东区:崔经理 181 5322 7169(微信同号)

华北区:杨经理 150 9223 5650(微信同号)

华南区:吴小姐 187 6593 1986(微信同号)

电话:0532-89082368  传真:0532-89082368

Q Q:903048040  邮箱:903048040@qq.com

青岛世纪手机访问
世纪管材微信二维码
  Copyright 2018 青岛世纪球墨铸铁管业有限公司 版权所有 All Rights Reserved